•To view an Expanded BOM
•User must be within an active Quote
• New or in an ICR with Editing ON
•Click the Wrench button for the applicable line item
.png)
•Configure the line item as desired
•Click the “Expanded BOM” option in the actions menu to open the expanded BOM
.png)
Understanding the Expanded BOM
•There are 3 levels to the expanded BOM, OEM Level 1, OEM Level 2, and OEM Level 3
.png)
•OEM Level 1
•Bulk component kits for lighting panels(P1, P2, P3)
•bus kits for power panels (P5)
•OEM Level 2
•assembly kits to simplify construction i.e. Bulk strap kits, and distribution kits
•OEM Level 3
•unassembled panelboard i.e. distributor strap kits, box, interior, and front.
•These come with UL and Siemens labels by system voltage
.png)
•General Parts information, qty, descriptions etc.
How Order Processing Works
•To View line items being submitted for order
•Users will need to turn on the Show Child Lines” option on the manager order screen in COMPAS
.png)
•Only child lines will be submitted for order, the main line item will not pass, as Siemens will be providing the parts for configured lines, but not assembling in the factory.
•COMPAS will do a parts check to ensure over consumption does not take place.
•Siemens has minimum parts Quantities for orders being placed.
•COMPAS will do a check within each order to check if parts being ordered between lines are covered by a previous line item.
•If the parts are covered by a previous line item, the corresponding lines will be marked as “cancelled” so they are not processed on the order, but still show for alignment purposes