This article consolidates all the answers to your questions on panelboard configurator in COMPAS Go.
[click on the "Expand All" button to view the answers for all the questions and click on "Collapse All" to collapse all the questions or click on each question to get their respective answer]
/
- For P2 and P3, no. Main breaker and MLO require different panel constructions. P1, however, are field convertible between main breaker and MLO.
- If 208V, you will need to add 6” of additional gutter space to the top or bottom depending on where the meter is (it is always on the opposite side of the incoming). If 480V, you will need to 12”, and select ‘VT’ accessories in the metering accessories tab.
- Yes, but only in a P4 or P5 panel. When available, select 100% Rated in the breaker’s configuration.
- Select None for the panel Certification. Then, in the accessories tab of your breaker, select 50C Marine Calibration.
- 750MCM incoming lugs (any quantity) require an additional 6” of wire bending space that the system does not account for and will need to be added manually. Add 6” of additional gutter space to the incoming side of your panel.
- Interlocks can be configured only in P4 or P5 panels using a special mod. Please indicate in the description which breakers require them. If your panel has interlocks with a 3R/12 enclosure or a door-in-door trim, add 4” to the depth.