Load Center Updates - April 2020

This articles details the information on the knowledge base release of Load Center for the month of April 2020. Changes as part of the release are mentioned below


1. New Product Launch  PN & SN Plug-On Neutral Single Phase Load Centers

PN & SN replace PL & ES single phase load centers

  1. Generator Ready
  2. Riser Panel
  3. Renovation and Renovation with Feed Through Lug  
  4. Small Circuit Load Centers (was MCB Enclosure)
  5. Small Breaker Enclosures (was MCB Enclosure)

Configurator, Product Selector and Cross-Reference Tool are being updated for the COMPAS release.

2. Load Center Configurator - Application/User Interface (UI) changes

Updates to User Interface/ Configuration View to match updates in the SpeedFax

  1. Interrupt Ratings Max, Ground Bar – Factory Installed, Convertible, Neutral Provided, Enclosure Height , Enclosure Width x Depth
  2. This data included in Reports – Proposal & Estimate Sheet

Characteristic Main Type – Standard construction  - Main Breaker or Main Lug

Characteristic Load Center Type – Standard construction – Load Center

  1. 100 - 225 Amp. PN/SN 1 phase &  PL/ES 3 phase
  2. 300 - 400 Amp. EQ 1 & 3 phase

Characteristic Load Center Type – Special constructions – require fewer selections

  1. Load Center with Feed Through Lugs (was Trailer Panel)
  2. Load Center with First Surge – PN or SN versions
  3. Generator Ready, Riser, Renovation, Small Circuit Load Centers, Small Breaker Enclosures

Characteristic Main Type – Special constructions – require fewer selections  

  1. Main Lug - 500 Kcmil Max – SN3048L1200L50 (Gray) or SN3048L1200L5W (White)
  2. Selectable - add Lug or Bkr Kit - SN versions for field installation Main Breaker or Main Lug kits

3. Load Center Configurator – Quote/Order changes starting April 2, 2020

Quotes – Line items that used the Load Center configurator

PL/ES 1 phase & Murray products – consider changing to new PN/SN for non-stocked items
To make a change, treat similar to a standard product. 

  1. Add a Pricing Note to the quote to indicate that a line was previously price approved at $xxx.

Orders – Line items that used the Load Center configurator

PL/ES 1 phase & Murray products – consider changing to new PN/SN for non-stocked items

To make a change, treat similar to a standard product. Confirm the line is not released already.

  1. Add a Pricing Note to the ECR to indicate that a line was previously price approved at $xxx.

Pricing – Net Price for replacement items 



Article ID: 3727
Last updated: 31 Mar, 2020
Revision: 5
Releases / Announcements -> Load Center Updates - April 2020
https://sandy.compas.siemens-info.com/load-center-updates-april-2020_3727.html