This article provides steps and information on the EUSERC Multi Metering Switchboard in COMPAS Go.
SMM Commercial Multi-Metering SWBD Designed for West Coast to meet EUSERC requirements
Users on the West Coast work within guidelines on how products are made and installed. These guidelines are called EUSERC.
Electric Utility Service Equipment Requirements Committee formed in 1983.
The purpose of the organization is to promote uniform electric service requirements among the member utilities, publish existing utility service requirements for electric service equipment and provide direction for development of future metering technology.
SIEMENS Commercial Multi Metering equipment, SMM meets the EUSERC requirements.
Questions:
Note: Many options for the SMM switchboard are found in the Manual Layout view. Any Manual Layout option selected will disappear if a user selects “Delete Layout”. If a user gets a conflict message try to correct the issue without using Delete Layout