This article has a training video for Unit Substation (USS) in COMPAS Go. Unit Substations consist of a Primary, Transformer and Secondary.  High Voltage enters through the Primary section and exits through the Secondary. There is always a transformer between the Primary and Secondary. 

HV Primary Switch: Configure both “SIEMENS SIEBREAK” or Third-Party types. For Third-Party pricing, a RFQ (Request for Quote) must be submitted to MAP by Sales. Specifications and one line are required. The Third-Party Primary Switch configuration section of the USS requires pricing from a Map quote.  
 
Transformer: Request for pricing must be submitted to MAP. RFQ (Request for Quote). Specifications and one line are required. 
The transformer configuration section of the USS requires pricing and dimensions from the Map quote. 

Secondary: Configure Switchboard / LV Switchgear and add it to the Unit Substation. (Nested Configurator) Users can also import an existing Switchboard / LV Switchgear configuration from another quote. 

RFQ Documents: If specifications or one line documentation are not available for a Third-Party Primary Switch or the Transformer, users can get a check list. Check lists for Metal Enclosed Switchgear, Unit Substation Dry Type and Liquid Filled Transformers can be found in “Ask Sandy”.  Search for “Checklist” to find these topics containing Word Doc check lists. (Make it a Favorite) 

MAP Process  (Material Apparatus Pricing) 

Unit Substation Tips



Article ID: 4684
Last updated: 02 Aug, 2021
Revision: 3
Go Training ->
https://sandy.compas.siemens-info.com/_4684.html