Switchboard Approval drawing options


What options are available for switchboard approval drawings?

The default is to use the COMPAS drawing for approval drawing. Complex jobs sometimes require approval drawings. 

  1. Select "Drawing Approval Required"
  2. Choose Approval drawing type.
    1. Elevation Only = The factory will create a custom elevation drawing, showing front, plan & electrical views + notes and abbreviations
    2. Complete Package = The factory will create a custom elevation drawing and electrical schematics



Article ID: 841
Last updated: 21 Oct, 2020
Revision: 5
Configuration -> Switchboard Approval drawing options