MLO with 750MCM needs to have additional 6" of end Gutter Space for proper wire bending space
1. Select the 750MCM lugs
2. Select 6" additional end gutter space at Top or Bottom under enclosure calculation under the main
3. Please note P2 cannot exceed 74" and P3 cannot exceed 80"