This article details the information on the features and bug fixes released as part of COMPAS knowledge base. Following are released for the month of April 2025.
Note: This release is part of May 2025 release. Click here to view the May release.
|
- LoadCenter
.png)
|
|
- MCC
.png)
|
|
- Panelboard
.png)
|
|
- PowerMod
.png)
|
|
- Simple Products
.png)
|
|
- Switchboard
.png)
|
|
- Transformer
.png)
|
|||||||||||||||||||||| | | | | | | | | | | | | | | | | | | | | | | | | |
LoadCenter.
|
|
|
|
|
Notes: Many Quotes to be Red-Lined
|
|
- All Load Center products type match and use SAP List Pricing.
|
|
- Where “Child Lines” are needed (or other devices such as breakers are included in quotes), many of these other products may have price adjustments also, therefore quotes may get red-lined for re-evaluation.
|
|
|
|
Technical Info
|
|
|
|
|
|
|
..
MCC..
|
- Quotes no longer allow HD, LD, ND, HF, LF, NF 150-250A frame VL circuit breaker, Sentron Sensitrip circuit breaker, LG circuit breaker. Dual FCB LG circuit breakers are no longer available. Configure two 6 inch high density units instead.
|
|
- Added new standard WD wiring diagrams for 3VA FCB, SPD, 3VA circuit breaker SIRIUS contactor with ESP200 overload FVNR, FVR, 2S1W, 2S2W. Removed old standard D6 wiring diagrams for Sentron FCB, FDS, SPD, Sentron circuit breaker and fusible SIRIUS contactor with ESP200 overload FVNR.
|
|
- Added common factory options IR WINDOW 2 INCH, IR WINDOW 3 INCH, IR WINDOW 4 INCH.
|
|
- Changed fusible units with power fuses to lead time complexity E12.
|
|
- Set lead time group1 adder to true for certified drawings.
|
|
- Changed Allen Bradley 2100 high density 6 inch feeder to a maximum 125A frame, standard 12 inch and above 250A frame feeder to a maximum 200A trip, removed 400-600A feeders, removed size 5 starters.
|
|
- CT ratio for CT accessory is now being updated when trip amperage of breaker is changed.
|
|
- Changed wording from ABS STEEL VESSEL to ABS MARINE VESSEL for unit option abbreviations ABS1, ABS2.
|
|
- MCC unit only MCC level option code is now being set based on MCC level maximum engineering days, maximum material days, maximum manufacturing days.
|
|
- Changed 3VA trip amperage sizing for 480 100K and 600V for magnetic trip only 150A frame to the same as 480V 65K with 125A frame up to 90A. Removed 110A, 125A trip 250 frame 3VA62-CFAR and used 100A trip 150A frame 3VA61-CDAR.
|
|
- Fixed characteristic A7JMC_DOOR_MOD_CODE values when both analog meter and digital meter configured.
|
|
|
|
Technical Info
|
|
|
|
|
|
|
.
Panelboard..
.
PowerMod.
|
|
|
|
|
Notes: Many Quotes to be Red-Lined
|
|
- All Power Mod products type match and use SAP List Pricing.
|
|
- Where “Child Lines” are needed (or other devices such as breakers are included in quotes), many of these other products may have price adjustments also, therefore quotes may get red-lined for re-evaluation
|
|
|
|
Technical Info
|
|
|
|
|
|
|
.
Simple Products.
Switchboard. Contractor
.
Transformer.
|
|
|
|
|
Notes: Many Quotes to be Red-Lined
|
|
- Most LV Transformer products type match and use SAP List Pricing which being updated.
|
|
- Where “Child Lines” are needed (or other devices such as Lug Kits are included in quotes), many of these other products may have price adjustments therefore quotes may get red-lined for re-evaluation
|
|
|
|
Technical Info
|
|
|
|
|
|
|