Sandy FAQ

Configuration
How to add abbreviations in Switchboard configurations?
This article describes the how to add abbreviations to switchboard configuration. 1. Layout the switchboard configuration. 2. In drawing details, click on...
Views: 12501 Comments: 0
How to add notes in Switchboard configuration?
This article provides information on how to add notes in Switchboard configuration. 1. Layout the switchboard configuration. 2. In drawing details, click on...
Views: 12482 Comments: 0
How do I add a CT Compartment in Switchboard
CT Compartments are called out on construction drawings. CT (Current Transformer) compartments provide a compartment for local utilities to install their CT"s for eternal power metering ...
Views: 12888 Comments: 0
How to manual move branch breakers for Switchboard layout change?
Article describing manual rearrangement of branch breakers in Switchboard configuration. Configure Switchboard or open existing Switchboard line item. Go to Layout...
Views: 12562 Comments: 0
Switchboard configuration advance edit
This article describes how to add notes and small accessories to the configuration view in switchboard configuration. Step-by-step guide Configure Switchboard or open existing switchboard...
Views: 12692 Comments: 0
Busway Configurator / Sketcher - Navigation Tools
This article describes the Busway Sketcher toolbar options available for the user in COMPAS Go. Mouse: The scroll wheel is one if not the most important added...
Views: 12442 Comments: 0
How to configure Title 24 Compliant P2 Lighting Panel with CT Provisions?
Siemens has designed an easy to install, compact solution with CT Provisions for metering segregated loads within P2 Panels with up to 400A bus in a 20" wide x 7.75"...
Views: 12764 Comments: 0
How to change the circuit number in Panelboard configuration?
This article helps user to reset the circuit type for panelboard configuration. 1. Complete the Panel board configuration which drives to a specific Panel type...
Views: 12514 Comments: 0
How to add a main breaker to 100% rating in a MCC?
100% rated breaker start at 400A frame and must have copper lug material.
Views: 12449 Comments: 0
How to configure a NEMA Starter? (Video)
This instruction provides a user with the navigation required to configure a NEMA Starter. 1. Click the below icon from add product Following is available to the user. 2. Flow is...
Views: 12529 Comments: 0

Prev 21 / 24 Next
... 16 17 18 19 20 21 22 23 24(Page 21 of 24)